Estimated time expenditure required for data collection, by sampling design and AU, for actual distance, 3 × actual distance, and 5 × actual distance to and between clusters |
|||||
| Administrative unit |
Distance assumption |
Sampling design |
Length of work day assumption |
||
|
|
|||||
| 33 × 6 design (in team days) |
67 × 3 design (in team days) |
30 × 30 design (in team days) |
|||
|
|
|||||
| Fur Baranga |
Actual distance |
8.25 |
11.17 |
30.00 |
8.5 hr work day |
| Habila |
Actual distance |
4.13 |
5.58 |
15.00 |
12.0 hr work day |
| Fur Baranga |
3× Actual distance |
11.00 |
16.75 |
30.00 |
9.5 hr work day |
| Habila |
3× Actual distance |
8.25 |
13.40 |
30.00 |
9.0 hr work day |
| Fur Barnaga |
5× Actual distance |
11.00 |
22.33 |
30.00 |
11.0 hr work day |
| Habila |
5× Actual distance |
11.00 |
22.33 |
30.00 |
9.5 hr work day |
Deitchler et al. Emerging Themes in Epidemiology 2008 5:6 doi:10.1186/1742-7622-5-6 |
|||||